Residential Permit FAQs (2024)

What codes are the State Fire Marshal’s Office (SFMO) enforcing?

The SFMO has adopted the 2018 edition of the International Residential Code (IRC) with a few amendments. The SFMO will allow energy code compliance to be met through meeting the standards of either Chapter 11 of the 2018 IRC or the 2018 edition of the International Energy Conservation Code.

Where can I obtain a copy of the adopted codes?

The 2018 International Residential Code (IRC) and 2018 International Energy Conservation Code and published by the International Code Council. The code books can be purchased through the International Code Council or other retail bookstores.

Does the code adopted by the SFMO apply to renovations?

No. The regulations apply to new construction and, beginning October 1, 2011, additions over 30 square feet.

Will the code adopted by the SFMO require residential sprinklers?

The law prohibits the SFMO from requiring sprinklers in one and two family residences.Under the adopted rules, sprinklers will not be required for three unit or more townhouses that are separated by a 2-hour fire barrier, regardless of square footage. A local government may require sprinklers in one and two family dwellings.

Do I need a residential building permit to place a manufactured home or modular home?

No. Manufactured and modular homes are inspected at the factory. Manufactured homes must be installed by licensed installers and must have an installation decal applied after completion of the set-up. If a manufactured home owner chooses to have an inspection of the installation, he or she should call (615) 741-7192.

Do I need a permit for a manufactured home or modular home?

Only if a custom addition, site built deck, porch or stoop is built next to the home. A Manufactured/Modular Site Work Permit is required for that work. This will be inspected after the work is complete.

Why is the state residential building permit only required in some areas of the state?

When the state residential building permit program was passed, many areas of the state, generally the most populous areas, had a robust residential building code enforcement program in place. Those jurisdictions may continue to operate as they always have so long as they have a building code that is current within seven years of the most recent edition of the code. Additionally, a county legislative body may vote to remove the unincorporated areas of the county or a city legislative body may vote to remove the city from the state program. This action must be by a two-thirds vote.

No. The SFMO will only be enforcing the codes it adopts. Local governments will be responsible for enforcing any other code or requirement.

Where will builders or property owners go to obtain a building permit?

A list ofIssuing Agents, those authorized to issue building permits on behalf of the state, is available here. Permits may also bepurchased at this site.

Do I need other permits if I have a state residential building permit?

The state residential building permit is a building permit only. It is not:

  • Grading or fill approval
  • Determination of flood plain compliance
  • A septic or sewer permit; or
  • An electrical permit.
  • Zoning approval

The permit does not authorize any violation of any state law or regulation or any local ordinance. A permit only gives you the right to build if you are in compliance with all other state and local laws, regulations and ordinances.

Can a homeowner build his/her own house?

Yes. Pursuant to TCA § 62-6-103, an owner of property may construct a single residence once every two years for his/her own use, as long as it is not for resale, lease or rent without being a licensed contractor. However, anyone hired by the homeowner whose portion is $25,000 or more would not be exempt from the contractors’ licensing requirements.

How do I check to see if my contractor is licensed?

You can check it online atverify.tn.gov

How long is my permit valid?

Work must be started within 180 days after the permit is issued. A permit expires upon completion of the work and every building permit expires two years from the date of issuance or upon issuance of a certificate of occupancy, whichever occurs first, unless: (1) the inspector determines that substantial progress has been made in the work authorized by the permit; and (2) the Commissioner of Commerce and Insurance, or designee thereof, grants an exception in writing after receiving a written request.

Who is responsible for requesting/scheduling an inspection?

The permit holder is solely responsible for requesting an inspection. Subcontractors should not schedule an inspection. Homeowners should only schedule an inspection if the homeowner is the permit holder.

How long will it take to get an inspection?

The law requires all inspections to occur within three working days of when the request is made to the inspector, except for footer inspections which are to be performed within one working day of the request. Additionally, the rules allow any inspection to be waived if an inspection letter approving the work is signed and submitted by an architect or engineer currently registered in the State of Tennessee.

How many inspections will be required?

Three inspections will be required: the foundation prior to pour, the rough-in/framing, and at final construction. If your foundation is to be a concrete slab under a living space with separately poured footing, you will need a fourth inspection. After October 1, 2011, inspections will also be required on plumbing and mechanical systems.

When should I request an inspection?

  • Foundation Inspection - After poles, piers, trenches or basem*nt areas are excavated and any required forms erected and any required reinforcing steel is in place and supported prior to the placing of concrete. The foundation inspection includes excavations for thickened slabs intended for the support of bearing walls, partitions, structural supports, equipment and special requirements for wood foundations. If rebar is required in the footing or slab, it should be in place prior to the inspection. Monolith poured slabs are inspected the same as a footing.
  • Slab Foundation Other Than a Monolith Pour Inspection - This occurs when a slab is poured that does not have integral footings. An inspection is required in addition to the foundation inspection. The inspection should be requested after excavation, fill material is placed and compacted, and reinforcement and forms are in place. This is not required for garage slabs, only for slabs of living spaces.
  • Rough-In/Framing Inspection - After floor, wall and roof framing; fire stopping; draft stopping; bracing; rough-in plumbing; rough-in mechanical and rough-in electrical are in place. If batt or roll wall insulation is used, it must be in place prior to requesting an inspection. If a plastic vapor barrier is used, it should be installed after the inspection. If loose-fill or spray applied insulation is used, the request should be made before it is installed (a manufacturer’s product data sheet and installation certificate stating the product meets or exceeds the energy code will be required).
  • Final Inspection - after the permitted work is complete and prior to occupancy.

Can an inspection be waived?

Any inspection may be waived if an inspection letter approving the work is signed and submitted by an Architect or Engineer currently registered with the State of Tennessee.

Do I have to pay for a re-inspection?

One re-inspection per permit may be performed without any additional fee. A second or subsequent re-inspection costs $100 each, which may be paid online or to any Issuing Agent.

If I have a complaint about an inspector, who do I call?

You mayfile a complaint to the Department through CORE, or you may call the Department at 615-741-7170.

What happens if my contractor or owner permit changes?

If, during the construction process, a property owner hires a contractor or there is a change of contractor, a new permit must be obtained. A refund of any inspection fees for inspections not performed on the original permit may be requested from the Department. Refund requests must be made from the Department and not an Issuing Agent.

When can a local government opt out of the residential building code requirements?

A city or county may opt out at any time. The law allows a city or county to opt out through the passage, by a two-thirds vote, of a resolution to exempt the city or county. The opt out resolution expires 180 days following the date of the election for the city or county's legislative body. If the subsequent legislative body does not vote to opt out prior to the expiration of the opt out resolution, the SFMO will begin to enforce the residential building code requirements and will enforce them until the city or county decides to enforce residential building codes or passes another opt out resolution.

If a city or county is currently enforcing a one and two family residential code, and does not opt out, will the city or county be affected with respect to its one and two family residential code enforcement?

The SFMO has developed a simple form for cities and counties to complete to become an “exempt” jurisdiction for residential building code enforcement. As long as the city or county has a code that is current within seven years of the latest edition (other versions can be approved in writing by the SFMO) the jurisdiction will not be affected except to show that it is adequately enforcing its code. The Department requests 90 days notice if a city or county wants to change who enforces residential building codes to ensure deputy building inspectors and issuing agents are obtained or notified of the changes.

If a city or county does not opt out and does not enforce its own residential code (current within seven years or approved in writing), will the SFMO enforce the one and two family residential code in the jurisdiction?

Yes. The SFMO will utilize contract employees (like it does with the electrical inspection program) and/or agreements with local governments to provide for inspections. The SFMO has been offering classes to ensure that we have certified inspectors available to perform the required inspections.

What is the cost to a local government for the SFMO to enforce residential building codes?

None. There is no cost to local governments. Inspections are performed by contract employees who are paid by the State.

How do you become an issuing agent?

The Department is advertising for and contracting with entities to be issuing agents. Issuing agents will receive $15 for each permit sold.

What are the benefits for and costs to citizens in a city or county with a qualifying one and two family residential code?

  • First, consumers will have protection from substandard construction and will benefit from the reduced energy costs in soundly constructed homes. The U.S. Department of Energy estimates that homes built to a modern code save 30% to 50% in energy usage costs. Appraisals of energy-efficient homes could be higher than one that does not meet energy standards, which could impact mortgage loan to value ratios positively.
  • Identifying any mistakes before they have been concealed by further construction will make any correction less costly. Reputable home builders benefit from having standards that apply to all contractors and from enforcement of those standards.
  • Homes built to a residential code are safer.
  • Homes required to properly dispose of waste will protect the environment.
  • New homeowners in cities and counties with codes that are effectively enforced may benefit from an ISO Building Code Effectiveness Grading System premium discount on their homeowner’s insurance. Homes that are constructed meeting higher standards may suffer less damage in a storm, for example, and in the long term reduced claims would impact risk-based insurance rates.
  • Reduced energy costs more than offset applicable permitting and inspection fees in a very short period of time, which impacts the long-term affordability of a residence.

What is the cost of a permit?

The permit fee is based on the cost of construction. You can use thisfee scheduleto estimate your permit fee. This fee covers the cost of all required inspections and one free re-inspection. Additional re-inspections cost $100 each.

My question is not answered above, how should I contact the Department?

Click Here to email your question to the Departmentor you may call 615-741-7170.

Residential Permit FAQs (2024)

FAQs

Do you need a permit to remodel a bathroom in NJ? ›

The standing rule in New Jersey is if there is not a minor change, then a permit is required. Here are some instances where you will need a permit for a bathroom remodeling project in New Jersey: External Hose Bibs: If you are adding plumbing that will include hose bibs for the outside of your home.

What can I build without a permit in NJ? ›

Some Common types of work not requiring a Construction Permit include:
  • Exterior and interior painting.
  • Installation, repair, or replacement of interior finishes of less than 25 percent of the wall area in a one or two family dwelling.
  • Replacement of glass in any window or door.

What is the penalty for building without a permit in NJ? ›

You may subject yourself to penalties and/or fines of up to $2,000 a day until permits are issued. If you proceed with your construction project without having a required permit and you get “caught,” before a permit can be issued you will need zoning approval and you may need a variance or planning board approval.

Do you need a permit to replace a roof in NJ? ›

Replacement of roofing on a 1 or 2 family home is considered ordinary maintenance and does not require a permit. Replacement of roof sheathing or roof rafters does require a permit. 25.

Do I need a permit to replace sheetrock in NJ? ›

The following are considered ordinary repairs and would not require a permit: • Exterior or interior painting. Installation, repair or replacement of less than 25% of plaster or drywall in a 1 or 2 family home. Vinyl or Paper wall covering. Replacement of glass in any door or window.

Can a homeowner do his own electrical work in NJ? ›

As long as the property owner owns and occupies the property, they can do the work themselves. They have to get the proper permits.

What size shed can you build without a permit in NJ? ›

For this reason, homeowners can install sheds without a UCC permit (regardless of floodplain) as long as they meet the following criteria: 200 square feet or less in area; less than 10 feet in mean height; accessory to R-2, R-3, R-4, or R-5; and containing no utilities.

Can I do my own plumbing in NJ? ›

A licensed plumbing, electrical or fire contractor is required for all work on commercial properties and multiple family dwellings. Homeowners fo single-family homes can conduct the work themselves if they are knowledgeable in the field of work to be performed.

Can I build a shed without a permit in NJ? ›

Do I Need a Permit for a Shed? Maybe. Accessory Storage Structures over 200 square feet and/or height greater than 10 feet require prior approvals, permits, and footings. Accessory Storage Structures 200 square feet or less and 10 feet or less in height require prior approvals but do not require a permit or footings.

What happens if you don't get a permit in NJ? ›

The penalty can be up to $2,000 per subcode and an additional $2,000 per week that the violations remain outstanding. The violation may lead to a summons to appear in municipal court to enforce the payment of the penalty.

Can you finish a basem*nt without permit in NJ? ›

You can even be subjected to paying a fine or a penalty if you don't have a permit. With this, it's recommended that you get a permit when you plan on having your basem*nt finished. If the renovations are done without a permit, at least get a retrospective permit and apply for inspections.

Do you need a permit to remove a wall in NJ? ›

Building permits – The last of the three types of permits normally needed for a kitchen project (along with electrical and plumbing permits) is a building permit. You will need this type of permit for your kitchen project in NJ if you are taking down a wall or making other changes to the structure of your home.

Do you need a permit to replace a water heater in NJ? ›

Our customer Service Professionals can help you find this information over the phone. Simply call us at 1-800-539-7734 24 hours a day to get a water heater specialist. Do I need a permit to replace a water heater? Yes, all towns in New Jersey require a plumbing permit.

Do I need a permit to replace my air conditioner in New Jersey? ›

Yes, you do need a permit to install HVAC systems in New Jersey. The New Jersey Uniform Construction Code (UCC) requires homeowners to obtain permits for HVAC installations, including both heating and cooling systems.

Do you need a permit to replace an existing fence in NJ? ›

Yes, you do. Even if you are replacing an existing fence in kind, it is necessary for you to obtain a zoning permit. In order to do that, submit a zoning application along with a copy of your survey to scale indicating the location, type, and height of your fence. The application fee is $50.00.

Can I remodel a bathroom myself? ›

With the right tools, planning, and resources, it is possible to complete a lot of projects without having to hire an expensive contractor. Even small changes to tile, fixtures and other elements in the bathroom can make a world of difference without breaking the bank.

What needs a permit in NJ? ›

If you're planning on making any changes or renovations to your space, you'll probably need to get a building permit. Building permits are required for building, structural, electrical, HVAC, and plumbing projects, and help to ensure that your space is safe for your team and your customers.

Do I need permission to add a bathroom? ›

As with re-fitting kitchens, there's normally no need for planning permission unless the building is listed. Building Regulations are only likely to apply where you decide to add a new bathroom, for example in a former bedroom or storage area. This may include some or all of the following: New drainage.

Do I need permit to renovate kitchen in NJ? ›

Here we list some of the renovations that will require a permit and possibly an inspection after work is completed: Major renovations to bathrooms, kitchens, basem*nts. Cutting holes for new windows or doors. Installing new or removing existing plumbing or electrical service.

Top Articles
Latest Posts
Article information

Author: Rubie Ullrich

Last Updated:

Views: 6581

Rating: 4.1 / 5 (72 voted)

Reviews: 87% of readers found this page helpful

Author information

Name: Rubie Ullrich

Birthday: 1998-02-02

Address: 743 Stoltenberg Center, Genovevaville, NJ 59925-3119

Phone: +2202978377583

Job: Administration Engineer

Hobby: Surfing, Sailing, Listening to music, Web surfing, Kitesurfing, Geocaching, Backpacking

Introduction: My name is Rubie Ullrich, I am a enthusiastic, perfect, tender, vivacious, talented, famous, delightful person who loves writing and wants to share my knowledge and understanding with you.